“Soviet Planning and Spatial Efficiency”
Aktiubinsk, 94
Ambartsumov, V., 116
American Society for Testing and Materials (ASTM), 107
Amvrosievka plant, 12, 80; automatic shaft kiln, 27, 91
Archangel, 58
Associaçāo Brasileira de Normas Tecnicas, 108
Average length of haul: planning target (see also Success indicators), 40; historical trends in, 44–45, 48
Azov-Black Sea region, 80, 91
Bain, J. S., 21, 24, 109
Baku, 48
Balzak, S. S., 48, 116
Barnaul, 92
Bashmachnikov, I. E., 107, 117
Basing-point pricing, 35
Belgorod plant, 14, 26
Belorussia, 14, 18, 51, 64, 91
Belov, G. G., 45
Bergson, A., 114
Bernaut, R., 114
Blanks, R. F., 108
Bogachik, M. T., 109, 113
Bogue, R. H., 8, 108
Brazil, 85
Briansk plant, 17, 29, 91, 94, relative cost and strength of pozzolan, 8–9
Brodskii, G., 70, 75, 76, 78, 89, 91, 92, 98, 113, 114, 117, 119
Bureau of Mines, 9
Butt, Iu. M., 9
Bykovskii, V., 116, 117
Cement consumption: historical shifts in regional shares, 44–45; indicators of demand, 51–54; demand inelasticity, 101, 118
Center region, 64
Central Asia, 58, 75, 89
Central Asia/Kasakh SSR, 17, 18, 51, 53, 55, 56
Central Black Earth belt, 56
Chernaia Rechka, 73, 91
Chimkent, 94
Chudevo, 31
Clark, M. G., 11, 108, 117
Clay: as input to portland, 6; location of, 15
Coal: as input to portland, 6; locational flexibility permitted, 15–16
Construction of huge plants, 24, 26
Conversion coefficients for portland cement, 85, 86
Costs: inefficiency of location, 61–67; ranges, 95–97. See also Leningrad, Production costs, Total cost, Transport costs
Crimea, 78, 82, 98
Crosshauls: criticism of, 71–76; linear program analysis of, 76–84, 101
Demand, see Cement consumption
Dnepropetrovsk, 30, 31, 91
Donets Basin (Donbass), 29, 49, 91
Donets oblast, 80, 92, 96, 97
Eastern Siberia, 51, 53, 54, 64, 103, 113
Ermakov, I., 112
Europe, North, 58
Evdokimenko, A., 86, 108, 120
Far East, 17, 18, 26, 49, 51, 53, 54, 56, 60, 64, 66, 82, 87, 98, 103, 115
Feigin, Ya. G., 48, 116
First Five Year Plan, 20, 51, 52 53, 54, 116
Fuel input, 6
Gaposhkin, F., 117
Gershberg, A., 108
Ghosh, A., 84, 120
Gigant plant: new plant design, 24, 26; early Gigant plant, 29
Gigantomania, 58
Glavstroimaterial, 30
Glavstromstroi, 30
Glavtsement, 31
Glawostoktsement, 31
Glavzapadtsement, 31
Gor’kii, 71, 91, 94, 97
Gorskii, D. V., 48, 116
Gosplan (USSR), 32, 115
GOST (State standards), 107, 108
Grades of portland: in early 1930’s, 6–7; multiplicity of, and inefficiency, 85–88
Greiman, A., 23, 109
Grinev, K. M., 112
Gutsev, E. G., 47
Gypsum: input to portland, 6; loose constraint on location, 16
Haul, see Average length of haul Henderson, J. M., 84, 119
Holzman, F., Ill, 117
Hunter, H., 100, 108, 111, 119, 120
Hypothetical Minimum Average Length of Haul (HMA), 78, 80, 82, 90, 92, 94, 98
Inefficiency in location, 61–67
Inefficiency of transport operation: modal composition of cement traffic, 70–71; crosshauls, 71–76
Iung, V. N., 26, 112, 115
Jasny, N., 115
Karaganda, 15
Karelian oblast, 95
Kazakh SSR, 51, 53, 58, 59, 94
Kazanskii, A., 30, 113, 115, 117, 118
Kemerovo, 92
Kennedy, H. L., 108
Khabarovsk, 26
Khar’kov, 31, 91
Khodorov, E.I., 112
Kholin, I. I., 117
Khrennikov, M., 117, 119
Kirgizia (Kirgiz SSR), 51, 82, 98
Kisliatkov, L. A., 112
Kosaia Gora, 30, 31
Kramatorsk, 91
Krasheninnikov, M. N., 112
Krichev plant, 14, 64, 91
Krupskii, A., 108
Kuchurin, S. F., 111
Kuibyshev, 71
Kursk oblast, 2 9
Kuvasai, 75, 89, 91, 99, 114
Leningrad, 30, 60, 89, 94, 95, 113; high production cost in region, 17; mill prices in Leningrad oblast, 18
Lime sources (marl, chalk, limestone), 12–15
Limestone: as input to portland, 6; location of, 12–14
Linear program and analysis of crosshauls, 76–84, 89–99; assumptions of analysis, 77–80; simplex algorithm, 80–81
Lipetsk steel works, 31, 56
Livshits, R. S., 50
Local industry, 30, 75, 89, 113–114
Location of cement industry, 10–12; comparison with steel industry, 10–11; historical shifts in production, 43, 46–50; production location in 1930’s, 54–61. See also individual place names
Location or raw materials, 10–16; western availability, 58–59. See also specific materials
Location of selected industries, 50
Loginov, Z. I., 109, 112, 113, 115, 117, 120
Lur’e, Iu. S., 13, 108
Machlup, F., 35–36, 107, 114
Malafeev, A. N., 114
Mal’tsevskii combine, 29
Marketing orders, 32
Meliushev, N., 117, 119
Moscow (city), 52, 78; (oblast or region), 18, 24, 29, 33, 48, 56, 89, 92, 95, 97
Murmansk, 95
Nakaznoi, V., 119
Narodnyi komissaviat putei soobshcheniia (NKPS), rail map, 89, 91
National Building Materials Marketing Agency, see Soiuzstromsbyt
Naumova, L. N., 14, 107, 113
NKTorg, 32, 115
North region, 63; Northern Caucasus, 34, 48, 49, 55, 60, 64; Northwest region, 63; Northern oblast, 95
Nove, A., 115
Novorossiisk, 34, 48, 55, 60, 80, 82, 91, 97, 108, 115; relative costs and strength of pozzolan, 8–9; and automatic shaft kilns, 27; Novorossiisk-Leningrad shipments, 70–72
Novorostsement, 29
Novosibirsk, 34, 54, 78, 91, 92
Odessa, 82, 98
Oil well cement, 48
Omsk, 92
Origin and destination tables: points used for linear program analysis, 70, 78, 79; tables extant, 76
Pavlenko, I., 23
Pennsylvania, 26
Penza, 91
People’s Commissariat for Trade, see NKTorg
Pikalevo, 60, 63
Place names, see tables and under individual names of most important places
Podgornoe, 27, 97
Podol’sk plant, 14, 30, 114
Ponamarev, I., 108
Portland cement: raw materials, 5–7; prices, 17–18; technology, with rotary kiln, 19–20, and with shaft kiln, 26–27; conversion coefficients, 85, 86. See also Clay, Coal, Grades, Gypsum, Prices
Portland Cement Association, 9, 108
Portland-pozzolan, see Pozzolan cement
Portland-slag, see Slag cement Portland-trass, see Pozzolan cement (trass)
Pozzolan additives, in relation to location, 15–16
Pozzolan cement, 5; at Novorossiisk, 8–9; costs, inputs, strengths, 810; trass, 115; production in 1930’s, 49, 55, 61
Preobrazhenskii, S. P., 26, 112, 115
Prices of portland cement (mill), 1929/30 and 1932/35, 17–18; basing-points, 35
Pricing principles: regional average production cost, 33; industry average production cost, 33; regional average delivered cost (zonal price system), 34–36; as encouragement of inefficient location, 59–60
Production costs: regional variation, 16–18; scale economies inferred from Soviet data, 20–24; TNEC estimates for American industry, 21–22; scale-transport trade-off, 24–26; lower western costs, 56, 58; per standardized unit of concrete, 86–87. See also Costs
Promyshlennost’ 1924, 113, 114; (1957), 116; (1964), 2, 107, 116, 120
Radkevich, I., 112
Rail distance, used in linear program, 90–91, 93
Railroad rates, 103, 110–112
Rosstroimaterial, 30
Rostov-on-Don, 80
Ruzaevka, 91
Samoilov, A., L., 115
Saratov krai or oblast, 18, 91
Second Five Year Plan, 48, 52, 53, 54, 116
Sengilei, 30, 31
Semipalatinsk, 91
Shaft kiln, see Portland cement
Shatalov, E. S., 47
Shchukin, S., 49
Shmukker, M., 21, 23, 109
Shneider, V., 117
Shober, F. A., 50, 113, 117
Siberia, 14, 49
Sinitsyn, P., 113
Skramtaev, V. G., 9, 108
Slag cement, 5, 10, 49, 61
Slivitskii, S., 24, 73, 115, 119
Smolensk, 94
Smurov, A., 73, 87, 115, 119
Sobolev, V., 108
Soiuzogneupory, 30
Soiuzstroi, 30
Soiuzstroimaterial, 30
Soiuzstromsbyt, 32, 89
Soiuztsement, 30, 75, 113
Sots stroi (socialist construction), 109, 115
Spassk, 24, 26, 54, 58, 73–74, 82, 98
Sprovochnik (estimating handbooks), 114, 115
Stalingrad, 71
Stalino, 80, 91, 92
Stalinsk, 54
Standards: Soviet portland, of 1936, 6–7; Brazilian portland, 7; American portland, 7
Stepanov, P. N., 48, 116
Stroitel’nye materialy, 30, 40
Success indicators: perverse results of incorrect unit in electric works and cotton goods, 36; translation coefficients for cement output and problems, 37-39; packing, 39–40; average length of haul, 40–41
Sverdlovsk, 17, 18
Svetlpv, N. S., 117
Tadzhik SSR, 58, 82, 98
Third Five Year Plan, 40, 115
TNEC, and current production costs, 4, 24, 109
Tomsk gubernaia, 58, 92
Total cost of alternative location patterns, see Inefficiency in location
Transcaucasus, 18, 53, 82, 98, 110, 113
Transport costs, 24, 109–112, 116
Trans-Siberia railway, 12 Tsement, 73
Tsemtrest, 29
Turkmen SSR, 58
Ukraine, 18, 49, 51, 55, 56, 61, 64, 78, 87, 91, 92, 95, 102
Ural-Kuzneksk combine, 60
Urals, 12, 14, 18, 49, 75
Uzbek SSR, 51, 113
Ukrsilikattrest, 29
Vasiutin, V. F., 48, 116
Veller, S. M., 107
Vladivostok, 82
Volga region, 14, 18, 48, 49, 55, 56, 64
Vol’sk cement plant, 14; production around, 48; Vol’sk-Moscow shipment, 70–72, 91
Voronezh oblast, 18, 27, 29, 91, 97
Vorovskii plant (Leningrad), 18, 30, 31, 63
VSNKh SSSR, 115, 116
Water input, 16
Water shipping routes, 70–72
Western oblast, 18, 94
Western Siberia, 18, 34, 51, 53, 54, 73, 75, 78, 87, 91, 92
Yenisey oblast, 58
Zubov, I., 108
We use cookies to analyze our traffic. Please decide if you are willing to accept cookies from our website. You can change this setting anytime in Privacy Settings.